Projects – RJ Consulting http://www.rjconsultingroup.com/en_US RJ Consulting Group Tue, 09 Jun 2020 17:43:59 +0000 en hourly 1 https://wordpress.org/?v=5.4.13 NBC Universal http://www.rjconsultingroup.com/en_US/project/nbc-universal/ Tue, 09 Jun 2020 17:43:59 +0000 http://event.ecom.casa/?post_type=project&p=75333 Boston University http://www.rjconsultingroup.com/en_US/project/boston-university/ Tue, 09 Jun 2020 17:36:31 +0000 http://event.ecom.casa/?post_type=project&p=75330 St John's University http://www.rjconsultingroup.com/en_US/project/st-johns-university/ Tue, 09 Jun 2020 17:33:28 +0000 http://event.ecom.casa/?post_type=project&p=75328 Pratt Institute http://www.rjconsultingroup.com/en_US/project/pratt-institute/ Tue, 09 Jun 2020 17:30:36 +0000 http://event.ecom.casa/?post_type=project&p=75326 Boston Museum of Fine Arts http://www.rjconsultingroup.com/en_US/project/boston-museum-of-fine-arts/ Tue, 09 Jun 2020 17:28:56 +0000 http://event.ecom.casa/?post_type=project&p=75324 The Smithsonian http://www.rjconsultingroup.com/en_US/project/the-smithsonian/ Tue, 09 Jun 2020 17:26:15 +0000 http://event.ecom.casa/?post_type=project&p=75322 Villa Rustica Renovation http://www.rjconsultingroup.com/en_US/project/villa-rustica-renovation/ Wed, 03 Jun 2015 08:37:29 +0000 https://structure.thememove.com/?post_type=project&p=74258

THE CHALLENGES

Understanding your manpower and cash issues can determine the success or failure of any project. Do not overestimate your capabilities or underestimate your cash flow.  Map out the details of all of the projects going on and what you are bidding that could happen in the near future.
Inflexibility is another challenges. Map out your plan and continually review your plan versus reality. Be willing to make changes when you see your plan is failing. Without a plan or refusing to gauge success against your plan has doomed many companies to continue down a road to failure. Have a willingness to change the plan and learn. Fail teachs you a lot.

PROJECT DESCRIPTION

  • Expediting and securing all permits, licenses, inspections, sign-offs, and occupancy certificates required by jurisdictional agencies.
  • Coordinating and supervising work performed by trades and outsite suppliers for quality, completeness, schedule, and conformity with plans and specifications/
  • Upon substaintial completion of contruction, examine work to assure efficacy quality and proper commisioning of equipment.
  • Developing a community relations program.
  • Provide the highest quality service to build-up the best result of the project as the agreement between 2 sites.

CONSTRUCTION PROJECTS

PROJECT DETAILS

Categories:
Surface Area: 450,000 m2
Completed: 2014
Value: $10000

BROCHURES

CONTACT

14 Tottenham Road, London, England.

(102) 6666 8888

info@thememove.com

(102) 8888 9999

Mon - Sat: 9:00 - 18:00

If you find a high quality constructor for your project?

]]>
Kitchen And Living Room http://www.rjconsultingroup.com/en_US/project/kitchen-and-living-room/ Wed, 03 Jun 2015 08:35:01 +0000 https://structure.thememove.com/?post_type=project&p=74257
The museum and research center of the Celtic culture. The museum was opened in 2011 by the Hessen office of built heritage conservation ( Landesamt fȕr Denkmalpflege Hessen). It is located at the important place of discovery of a Celtic settlement aged about 5 thousend B.C. In the front of the building you see visitors watching and enjoing at the location.

THE CHALLENGES

Understanding your manpower and cash issues can determine the success or failure of any project. Do not overestimate your capabilities or underestimate your cash flow.  Map out the details of all of the projects going on and what you are bidding that could happen in the near future.
Inflexibility is another challenges. Map out your plan and continually review your plan versus reality. Be willing to make changes when you see your plan is failing. Without a plan or refusing to gauge success against your plan has doomed many companies to continue down a road to failure. Have a willingness to change the plan and learn. Fail teachs you a lot.

iStock_000064636455_Large

PROJECT DETAILS

Categories:
Client: Awesome Company
Location: Barcelona, Spain
Surface Area: 450,000 m2
Completed: 2015
Value: $900,000
Architect: John Doe

PROJECT DETAILS

  • Expediting and securing all permits, licenses, inspections, sign-offs, and occupancy certificates required by jurisdictional agencies.
  • Coordinating and supervising work performed by trades and outsite suppliers for quality, completeness, schedule, and conformity with plans and specifications/
  • Upon substaintial completion of contruction, examine work to assure efficacy quality and proper commisioning of equipment.
  • Developing a community relations program.
iStock_000036665374_Large

OUR CLIENTS SAYS

If you find a high quality constructor for your project?

]]>
Contemporary Villa http://www.rjconsultingroup.com/en_US/project/contemporary-villa/ Wed, 03 Jun 2015 08:06:45 +0000 https://structure.thememove.com/?post_type=project&p=74253
The museum and research center of the Celtic culture. The museum was opened in 2011 by the Hessen office of built heritage conservation ( Landesamt fȕr Denkmalpflege Hessen). It is located at the important place of discovery of a Celtic settlement aged about 5 thousend B.C. In the front of the building you see visitors watching and enjoing at the location.

THE CHALLENGES

Understanding your manpower and cash issues can determine the success or failure of any project. Do not overestimate your capabilities or underestimate your cash flow.  Map out the details of all of the projects going on and what you are bidding that could happen in the near future.
Inflexibility is another challenges. Map out your plan and continually review your plan versus reality. Be willing to make changes when you see your plan is failing. Without a plan or refusing to gauge success against your plan has doomed many companies to continue down a road to failure. Have a willingness to change the plan and learn. Fail teachs you a lot.

PROJECT DETAILS

Categories:
Client: Kuler Themes
Location: Mountain View CA 94043
Surface Area: 450,000 m2
Completed: 2014
Value: $250.000
Architect: Jason & Perry

OUR CLIENTS SAYS

PROJECT SPECIFIC MILESTONES

Project Scheduling And Management

Nam viverra scelerisque turpis id fermentum. Sed bibendum sit amet odio tempor venenatis. Quisque vel lectus sem. Sed convallis ligula sit amet. Nam viverra scelerisque turpis id fermentum.
Quisque vel lectus sem. Sed convallis ligula sit amet. Nam viverra scelerisque turpis id fermentum.

Perform Value Engineering

Nam viverra scelerisque turpis id fermentum. Sed bibendum sit amet odio tempor venenatis. Quisque vel lectus sem. Sed convallis ligula sit amet. Nam viverra scelerisque turpis id fermentum.
Quisque vel lectus sem. Sed convallis ligula sit amet. Nam viverra scelerisque turpis id fermentum.

Inspections And Occupancy Permit

Nam viverra scelerisque turpis id fermentum. Sed bibendum sit amet odio tempor venenatis. Quisque vel lectus sem. Sed convallis ligula sit amet. Nam viverra scelerisque turpis id fermentum.
Quisque vel lectus sem. Sed convallis ligula sit amet. Nam viverra scelerisque turpis id fermentum.

Project Scheduling And Management

Nam viverra scelerisque turpis id fermentum. Sed bibendum sit amet odio tempor venenatis. Quisque vel lectus sem. Sed convallis ligula sit amet. Nam viverra scelerisque turpis id fermentum.
Quisque vel lectus sem. Sed convallis ligula sit amet. Nam viverra scelerisque turpis id fermentum.

If you find a high quality constructor for your project?

]]>
House Under The Palms http://www.rjconsultingroup.com/en_US/project/house-under-the-palms/ Wed, 04 Mar 2015 09:46:07 +0000 https://structure.thememove.com/?post_type=project&p=223

THE CHALLENGES

Intrinsicly matrix granular resources rather than orthogonal initiatives. Phosfluorescently provide access to B2B mindshare via reliable convergence. Completely generate optimal leadership and cross-platform total linkage. Continually conceptualize installed base leadership skills.

PROJECT DESCRIPTION

  • Continually transform reliable schemas and cross functional human capital.
  • Professionally envisioneer extensive ideas with collaborative quality vectors.
  • Progressively pontificate accurate process improvements whereas intermandated communities.
  • Proactively myocardinate functionalized quality vectors without.

CONSTRUCTION PROJECTS

PROJECT DETAILS

Categories:
Client: Awesome Company
Location: Barcelona, Spain
Surface Area: 450 m2
Completed: 2015
Value: $700,000
Architect: John Doe

BROCHURES

CONTACT

14 Tottenham Road, London, England.

(102) 6666 8888

info@thememove.com

(102) 8888 9999

Mon - Sat: 9:00 - 18:00

Looking for a quality constructor for your next project?

]]>